Wednesday, April 18, 2012

Lots of New

With the light coming in from the window it's hard to see, but for those who've been here, you can see that the layout is the same as before, but the counter tops are a bit higher. They're also nicer, in quartz. The cabinet fronts are glossy. The overall effect is much lighter than before because of the light that reflects off the surfaces. The induction burners are over the dishwasher on the left (behind the table in the photo).
The walls of the whole ground floor are off-white with a very slight green tint, like an apple (not the skin, the flesh). We're very happy with it and don't want to have to go through another repainting job. It seems that in the States painting doesn't involve so much work. Of course with the water damage, we knew there would be lots of priming, but we've been through three weeks of dust and paint before another week of kitchen installation. That took longer than expected because the guy had so much readjusting to do.
I didn't want to do any blogging until it was done. Then, the news from Louis this morning (preceding post) pre-empted my own news.
At the end of March, Candace was in town and Samuel Labarthe was one of the actors dubbing the film she was working on. He invited her to see the play he's in these days and she invited me. The play is "Pensées Secrètes" ("Secret Thoughts", based on David Lodge's Thinks.... Just two actors: Samuel Labarthe and Isabelle Carré. Wonderful! I'm reading the novel now and the play, which Lodge also wrote, is better. Anyway, the French version is great and the actors are great and the set is great. We had a fine evening of catching up and then went for a drink after the play with Labarthe to thank him for the invitations.
The weather has turned cold and rainy. We need the rain, but I could do without the cold. I've been able to see a few ball games, PUC 1 and PUC 2. I've also seen a few Phillies games because I subscribed to MLB.com this year.
So, that sums it up. We're off to see Sacha, Gwen and Louis.

Sacha Lebelle-Thomas

4:00 a.m. April 18, 2012. 3 kg.: 49.5 cm. (6 lb.,almost 10oz.; 19.5 in.)
Mother and baby doing fine.

Paul and I are going over later this afternoon when visiting hours start. It's the same hospital where all four of my kids were born, just a few minutes from where Louis and Gwen live, so it was a logical choice for them.
That's all for this post. Coming up in the next one some pictures of the paint job and new kitchen.

Sunday, March 25, 2012

Glorious Spring

Our greengage plum tree is in full bloom. There were bees buzzing all around it and I hope that means we'll have some plums this year. The other plum tree is also in bloom, pink blossoms. I've planted the radishes and started other seeds. I've cleared the raspberry patch of weeds and now that there is lots of empty space we'll be able to transplant the newer raspberry plants that have started in front of the patch back to the pack, but I think it's best to wait until they've produced their fruit for this season. 
Today, France and the rest of Europe went on to daylight savings time, called "Summer Time" here. We are back to 6 hours difference with North America.
Today is a perfect day to go to a ball game. PUC 1 is playing Pessac in a double-header (PUC 1 and PUC 2 are always Sunday double-headers with a picnic lunch break between games.) and it's the first home weekend. I'll probably go for the second game, after lunch. 
Eating at home is a bit of a challenge right now. The painters are going faster than anticipated, but we've had to put on the brakes; there's just no space to move the furniture. They have to finish the living room so that we can store in there. Right now, they've almost finished the living room, dining room, and hall entry. The furniture is upstairs and in the entry and access to the basement. We wiggle around it. There is dust everywhere, of course. We do manage to have lunch and dinner, but it's a dusty atmosphere. Luckily for us, we are not prone to allergies or asthma. The floors, at least on the ground floor, should be sanded and varnished at the beginning of the week. Then we can move back into the living room and they can do the stairwell and hall upstairs. The repair and painting should not take as long as it has downstairs, so all in all, they will be finished with this almost a whole week before we expected. That means they'll want to dismantle the kitchen and do the electrical installations before we are ready. The new kitchen will be delivered on April 10, not before.
Must be off now -- to the market, lunch, and the ballpark!

Monday, March 19, 2012

Painters Start Today

I don't remember if I mentioned it, but back in October we had a bit of water damage from a freshly installed, faulty hose in the bathroom upstairs. The water could not have been flowing for more than two hours, but it was in the middle of the night. Emma had gone upstairs at about midnight and would have heard it if the hose had already ruptured and Paul got up at a little after 2 to discover the flood. He didn't get me up. I got up myself at 3. He was busy mopping up in the bathroom, but I went downstairs to find the flood there and I started mopping up the kitchen. Then, the basement.
Neither of us realized how much water had gotten under the floorboards, but as you can see, the damage to all the ground floor was pretty extensive. And the floor of the hallway upstairs is all warped. There's also damage in the stairwell....
So now, almost six months later, it's dry enough to paint. That's starting today. The painters are busy scraping what we didn't get, but you can see that we scraped a bit too.
We're taking advantage of the fact that we have literally moved everything from the ground floor (the floors there got damaged, too, and need sanding down and revarnishing) to redo the kitchen, too. This is something I've been wanting for many years. I'm quite happy with the layout. In fact, we're keeping the layout. After many tries with 3D software and paper cutouts, we could not find anything that served us as well. Still, it will be more modern, and the counter will be a few centimeters higher, which should be nicer for me, and will give us an extra drawer space all around.